Should I tour a custom-home builder’s active job sites before hiring them?

Yes, when practical. A finished home shows design and craftsmanship; an active jobsite shows how the builder actually manages construction.
What documents should I ask a luxury custom-home builder to show me before I hire them?

Ask for documents that show how the builder actually runs projects, not only a portfolio.
Asbestos, Lead Paint and Mold: What to Know Before Renovating an Older Luxury Home

Planning an older-home renovation? Learn when asbestos, lead-paint and mold reviews should happen, who should evaluate them and how to coordinate the work before demolition.
Can You Raise the Ceilings in an Older Scottsdale Home?

Ceiling height can often be improved in an older Scottsdale home, but the right approach depends on roof framing, building systems, approvals and the scope of the renovation.
How Should Driveway Access Be Evaluated on a Steep Lot?

A steep Scottsdale homesite needs early driveway evaluation for slope, geometry, drainage, fire access, grading, retaining, vehicle clearance and construction logistics.
What Does Value Engineering Mean on a Luxury Custom Home?

Value engineering on a luxury custom home means protecting the design intent while finding smarter ways to achieve it through scope, systems, details and construction methods.
How Detailed Should Selections Be Before Construction Starts?

Major custom-home selections should be resolved early enough to coordinate design, engineering, estimating and procurement before they create field changes or delays.
How Long Should Preconstruction Take Before a Scottsdale Custom Home Starts?

Custom-home preconstruction lasts as long as needed to align site, design, engineering, selections, approvals, budget and procurement before construction begins.
How Should Owner-Selected Upgrades Be Priced During Construction?

Owner-selected upgrades should be documented with the changed scope, credit for the original allowance or specification, added cost, builder markup and schedule impact.
What Is Builder Fee vs. General Conditions vs. Overhead?

Builder fee, general conditions and overhead are different parts of a custom-home budget. Understanding each helps owners compare proposals more accurately.